Achieving a flawless, professional finish is an artisan process that typically takes 3 to 5 days:

  • Substrate Preparation: Sanding, cleaning, and reinforcing the base structure.
  • Priming: Applying a structural mesh and a specialty bonding primer.
  • Layering: Hand-troweling 2–3 distinct coats of microcement base and finish layers.
  • Detail Sanding: Sanding precisely between coats to curate the exact texture desired.
  • Sealing: Applying high-performance, stain- and water-resistant polyurethane t